Multiple Parking Facilities, East Carolina University, Greenville, NC

As East Carolina University continues to expand enrollment, so does the need to accommodate more students and faculty. Rivers worked with ECU to plan and implement multiple parking facilities.

  • Reade Street Parking Lots consisted of multiple asphalt parking lots along three blocks of Reade St between Fifth St and Second St.
  • Rivers designed and engineered grading, drainage, curb and gutter, stone base, landscaping, irrigation, utility relocation including underground electrical service, poles and lights, and pedestrian shelter.
  • Girls Softball Field Parking Lot consisted of a study investigating the feasibility of constructing a parking lot: asphalt with curb and gutter, stormwater detention facility, storm drainage, landscaping and irrigation.
  • Rivers recommended improvements for the security cameras, telephones, lighting and bus shelters.
  • For the Freshman Parking Lot, Rivers planned the excavation, stone base, curb and gutter, chainlink fencing, and utility for a 1,002 space parking lot

Some other projects include:

  • Girls Softball Parking Lot Feasibility Study
  • Clark-LeClair Stadium Lewis Field (fka Harrington Field)
  • Learning Village: Phase I - School of Allied Health, Library and School of Nursing
  • Arlington Blvd. Extension, Topographic Survey
  • Allied Health Building Parking Facility Improvements, Charles Blvd & Greenville Blvd.
  • Football Practice Fields Improvements

Back to Institutional Projects

Current Bid Opportunities
Current information and requirements for responding to bid opportunities and updated bid results.
Learn more

Market Expertise
Our depth of experience has allowed us to grow our business across various market disciplines with specialized expertise.
Learn more