DSM Pharmaceutical Facility, Greenville, North Carolina
Rivers prepared a stormwater detention master plan outlining the current stormwater detention facility performance.
Rivers' primary objectives of the study were:
- To model the performance of the existing stormwater management facilities.
- To revise the most recently approved stormwater management plan (December, 1991)
- To remove additional stormwater runoff from future unspecified development.
- To develop a stormwater master plan that meets City of Greenville standards for Stormwater Detention.
- To include calculations demonstrating the effects of the addition of the DAP Facility.
- Weir capacity calculations were prepared for the two main effluent discharge points for the plant. These calculations determined the impacts caused by the DAP addition.