DSM Pharmaceutical Facility, Greenville, North Carolina

Rivers prepared a stormwater detention master plan outlining the current stormwater detention facility performance.

Rivers' primary objectives of the study were:

  • To model the performance of the existing stormwater management facilities.
  • To revise the most recently approved stormwater management plan (December, 1991)
  • To remove additional stormwater runoff from future unspecified development.
  • To develop a stormwater master plan that meets City of Greenville standards for Stormwater Detention.
  • To include calculations demonstrating the effects of the addition of the DAP Facility.
  • Weir capacity calculations were prepared for the two main effluent discharge points for the plant. These calculations determined the impacts caused by the DAP addition.

 